Hess Orthodontics


Hess Orthodontics was a Dental Buildout of 3,240 sq. ft. Specific Modifications and Requirements:
  •    Dirt floors, exposed truss and bare masonry walls
  •     Custom Built stainless steel water fall
  •     Upgrade to quartz counter tops
  •     Custom Cabinetry by Turn Key Builders
  •     Custom fabricated glass doors
  •     Upgraded floors and ceiling design
  Visit Website Download PDF
Hess Orthodontics
Dental

Implant Dentistry Periodontics & Facial Rejuvenation


Implant Dentistry Periodontics & Facial Rejuvenation was a Dental Buildout of 3,500 sq. ft. Specific Modifications and Requirements:
  •    Dirt floors, exposed truss and bare masonry walls
  •     Custom Cabinetry by Turn Key Builders
  •     Upgraded floors and ceiling design
  Visit Website  
Implant Dentistry Periodontics & Facial Rejuvenation
Dental

Jose M Goldberg DDS


Jose M Goldberg DDS was a Dental Buildout of 3,240 sq. ft. Specific Modifications and Requirements:
  •    Dirt floors, exposed truss and bare masonry walls
  •     Custom Cabinetry by Turn Key Builders
  •     Upgraded floors and ceiling design
  Visit Website
Jose M Goldberg DDS
Dental

Brian Weinert DDS


 
  Brian Weinert DDS was a Dental Buildout of 3,000 sq. ft. Specific Modifications and Requirements:
  •    Dirt floors, exposed truss and bare masonry walls
  •     Custom Cabinetry by Turn Key Builders
  •     Upgraded floors and ceiling design
  Visit Website  
Brian Weinert DDS
Dental

Moffett Dental Surgery Center


 
    Moffett Dental Surgery Center was a Dental Surgery Buildout of 2,968 sq. ft. Specific Modifications and Requirements:
  • Started with dirt floors, exposed trusses & bare masonry walls
  • Project included many art niches with granite sills
  • Buildout also included radius walls
  • Custom Cabinetry by Turn Key Builders
  • Interior Design included glass tiles and granite at reception
  • Interior also included solid granite interior logo detail
Visit Website
Moffett Dental Surgery Center
Dental

Southbay Dental


 
  Southbay Dental was a complete Demolition of 1,486 sq. ft. Specific Modifications and Requirements:
  •     Demolition of 30 plus year old suite in Shopping Center
  •     Upgraded electrical service and HVAC
  •     Cut concrete floors for new utilities in dental clinic
  •     Key West design with bead board accents
  •     Custom beveled edge wood ceilings and vinyl plank flooring
  •     Custom Built Cabinetry by Turn Key Builders
Visit Website
Southbay Dental
Dental

Mangrove Bay Dentistry


 
  Mangrove Bay Dental was a Dental Buildout of 2,300 sq. ft. Specific Modifications and Requirements:
  • Dental Buildout of new space
  • Dirt floors, exposed trusses, & bare masonry walls
  • Design Build Dental Project completed in 10 weeks
Visit Website
Mangrove Bay Dentistry
Dental

Endodontic Specialists


 
  Endodontic Specialists was a Dental Buildout of 3,300 sq. ft. Specific Modifications and Requirements:
  • Remodel for Endodontic Group
  • Demolition of walls and concrete flooring
  • Increased plumbing & mechanical needs
  • Upgraded doors, frames, hard gypsum ceilings, and flooring
  • Custom Cabinetry by TurnKey Builders
Endodontic Specialists
Dental

Bivens Orthodontics


  Bivens Orthodontics was a Demolition and Build out of 2,700 sq. ft. Specific Modifications and Requirements:
  • Demolition of Retail Space
  • Buildout of Orthodontic Space
  • Radial reception area
  • Center workstation for ease of workflow
Visit Website
Bivens Orthodontics
Dental

GC Dental Arts


    GC Dental Arts was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:
  •     The original building had dirt floors and no mechanicals
  •     New design build project has very efficient floorplan
  •     New floorplan included radius walls, new utilities to service the facility
  •     New facility included upgrade to commercial vinyl flooring
  •     Custom cabinetry designed by Turn Key Builders.
Visit Website
GC Dental Arts
Dental

Gassett Dental


Gassett Dental was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:
  •     Demolition of existing concrete floors
  •     Buildout to allow for plumbing and mechanicals
  •     Relocation of existing HVAC equipment and air handlers
  •     Custom recessed aquarium and finish materials were required
Visit Website Download PDF
Gassett Dental
Dental

Upshaw Dental


    Upshaw Dental was a complete Dental Buildout of 1,400 sq. ft. Specific Modifications and Requirements:
  •     Demolition and installation of new walls
  •     Added electrical components
  •     New Stone Accent walls and Cabinets
  •     Updated Finishes
  •     14th Floor Downtown Office Building
  •     After-hours demolition and material handlings
  •     Project completed within 3 weeks.
Visit Website
Upshaw Dental
Dental

Carr Pediatric Dentistry


    Carr Pediatric Dentistry was a Dental Buildout of 2,340 sq. ft. Specific Modifications and Requirements:
  •     Buildout of an existing masonry building with no floor, mechanical or electrical
  •     Custom Tiled Reception Counter
  •     Custom Cabinetry and Flooring
  •     Art Niches throughout the Suite
  •     Radius walls and arched openings
Visit Website
Carr Pediatric Dentistry
Dental

Kennedy Dental


    Kennedy Dental was a Dental Buildout of 2,800 sq. ft. Specific Modifications and Requirements:
  •     Dental suite including all new walls, floors, finishes
  •     Custom Cabinetry by Turn Key Builders
  •     Fire Sprinkler and Fire Alarm
Visit Website
Kennedy Dental
Dental

Krystal Clear Dental


    Krystal Clear Dental was a Dental Buildout of 2,100 sq. ft. Specific Modifications and Requirements:
  •     Demolition of total space and concrete floors
  •     Addition of plumbing & mechanicals
  •     The new design also included radius walls
  •     Custom Cabinetry & Sterile Unit by TurnKey Builders
  •     Radial reception center with granite counter
  •     Special order radius glazing detail
 
Krystal Clear Dental
Dental

Pedraza Dental


    Pedraza Dental was a Dental Buildout of 2,300 sq. ft. Specific Modifications and Requirements:
  •     Dental Buildout of new space
  •     Dirt floors, exposed trusses, & bare masonry walls
  •     Design Build Dental Project completed in 10 weeks
Visit Website
Pedraza Dental
Dental

Cornerstone Dental


    Cornerstone Dental was a complete Demolition of 2,600 sq. ft. Specific Modifications and Requirements:
  •     Demolition of concrete walls, floors, etc.
  •     Built out complete Dental Space
  •     Project Construction was economical
  •     Blueprint and Materials used for a chain of practices
Visit Website
Cornerstone Dental
Dental

Bourdman Dental


    Bourdman Dental was a Dental Buildout of 1,400 sq. Specific Modifications and Requirements:
  • Dental Buildout of Existing Walls, and Concrete Floors
  • Buildout to allow for plumbing and mechanicals
  • Plumbing and mechanicals for new dental chairs and equipment
Bourdman Dental
Dental

Big Bend Dental


    Big Bend Dental was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:  
  • Started with dirt floors, exposed trusses & bare masonry walls
  • New design build project included radial wall design
  • Buildout also included custom headers and arches
  • Office also has custom ceilings, ceramic tile floors & walls
Visit Website
Big Bend Dental
Dental

American Family Dental


    American Family Dental was a renovation of an existing building. Specific Modifications and Requirements:
  • Alterations to existing bath and lab to expand lounge
  Visit Website
American Family Dental
Dental

Anderson Dental


    Anderson Dental is a 2,300 sq. ft demolition and renovation. The building was an existing shopping center suite. Specific Modifications and Requirements:
  • Demolition and Removal of Main Switchgear
  • Remove firewalls and re-build to meet code
  • Total renovation for new dental-treatment chairs
Anderson Dental
Dental
Copyright © 2014 Turnkey Builders | Dental & Medical Office Construction