![](https://turnkeybuildersfl.com/wp-content/uploads/2013/06/1371253767img14.jpg)
Hess Orthodontics
- Dirt floors, exposed truss and bare masonry walls
- Custom Built stainless steel water fall
- Upgrade to quartz counter tops
- Custom Cabinetry by Turn Key Builders
- Custom fabricated glass doors
- Upgraded floors and ceiling design
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/1371253767img14-2ukx8xxmwctrpmvwr509ai.jpg)
Hess Orthodontics
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2013/02/williams.jpg)
Implant Dentistry Periodontics & Facial Rejuvenation
Implant Dentistry Periodontics & Facial Rejuvenation was a Dental Buildout of 3,500 sq. ft. Specific Modifications and Requirements:
- Dirt floors, exposed truss and bare masonry walls
- Custom Cabinetry by Turn Key Builders
- Upgraded floors and ceiling design
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/williams-2tvg5w24l8yjqxxgmue9ze.jpg)
Implant Dentistry Periodontics & Facial Rejuvenation
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2013/02/Goldberg.jpg)
Jose M Goldberg DDS
Jose M Goldberg DDS was a Dental Buildout of 3,240 sq. ft. Specific Modifications and Requirements:
- Dirt floors, exposed truss and bare masonry walls
- Custom Cabinetry by Turn Key Builders
- Upgraded floors and ceiling design
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/Goldberg-2tvg4n7a6soblmg84le70q.jpg)
Jose M Goldberg DDS
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2013/02/weinert.jpg)
Brian Weinert DDS
Brian Weinert DDS was a Dental Buildout of 3,000 sq. ft. Specific Modifications and Requirements:
- Dirt floors, exposed truss and bare masonry walls
- Custom Cabinetry by Turn Key Builders
- Upgraded floors and ceiling design
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/weinert-2tvg63z3lojetzydwf1l3e.jpg)
Brian Weinert DDS
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img33.jpg)
Moffett Dental Surgery Center
Moffett Dental Surgery Center was a Dental Surgery Buildout of 2,968 sq. ft. Specific Modifications and Requirements:
- Started with dirt floors, exposed trusses & bare masonry walls
- Project included many art niches with granite sills
- Buildout also included radius walls
- Custom Cabinetry by Turn Key Builders
- Interior Design included glass tiles and granite at reception
- Interior also included solid granite interior logo detail
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img33-2s6r4v9m4aq7of1w93db0q.jpg)
Moffett Dental Surgery Center
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_09841.jpg)
Southbay Dental
Southbay Dental was a complete Demolition of 1,486 sq. ft. Specific Modifications and Requirements:
- Demolition of 30 plus year old suite in Shopping Center
- Upgraded electrical service and HVAC
- Cut concrete floors for new utilities in dental clinic
- Key West design with bead board accents
- Custom beveled edge wood ceilings and vinyl plank flooring
- Custom Built Cabinetry by Turn Key Builders
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_09841-2s6r54te2j8iw3s5ixf4zu.jpg)
Southbay Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img34.jpg)
Mangrove Bay Dentistry
Mangrove Bay Dental was a Dental Buildout of 2,300 sq. ft. Specific Modifications and Requirements:
- Dental Buildout of new space
- Dirt floors, exposed trusses, & bare masonry walls
- Design Build Dental Project completed in 10 weeks
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img34-2s6r5gdjhg9ukkgcymfgne.jpg)
Mangrove Bay Dentistry
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img13.jpg)
Endodontic Specialists
Endodontic Specialists was a Dental Buildout of 3,300 sq. ft. Specific Modifications and Requirements:
- Remodel for Endodontic Group
- Demolition of walls and concrete flooring
- Increased plumbing & mechanical needs
- Upgraded doors, frames, hard gypsum ceilings, and flooring
- Custom Cabinetry by TurnKey Builders
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img13-2s6r5m13cm9bmr1lalqyve.jpg)
Endodontic Specialists
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_0733.jpg)
Bivens Orthodontics
Bivens Orthodontics was a Demolition and Build out of 2,700 sq. ft. Specific Modifications and Requirements:
- Demolition of Retail Space
- Buildout of Orthodontic Space
- Radial reception area
- Center workstation for ease of workflow
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0733-2s6q6al2lyqtnutqq1y0i2.jpg)
Bivens Orthodontics
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img12.jpg)
GC Dental Arts
GC Dental Arts was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:
- The original building had dirt floors and no mechanicals
- New design build project has very efficient floorplan
- New floorplan included radius walls, new utilities to service the facility
- New facility included upgrade to commercial vinyl flooring
- Custom cabinetry designed by Turn Key Builders.
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img12-2s6q6kif32up7osm5hjtai.jpg)
GC Dental Arts
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img3.jpg)
Gassett Dental
Gassett Dental was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:
- Demolition of existing concrete floors
- Buildout to allow for plumbing and mechanicals
- Relocation of existing HVAC equipment and air handlers
- Custom recessed aquarium and finish materials were required
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img3-2s6q6kdw8sbifn1qrmd5oq.jpg)
Gassett Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_0888.jpg)
Upshaw Dental
Upshaw Dental was a complete Dental Buildout of 1,400 sq. ft. Specific Modifications and Requirements:
- Demolition and installation of new walls
- Added electrical components
- New Stone Accent walls and Cabinets
- Updated Finishes
- 14th Floor Downtown Office Building
- After-hours demolition and material handlings
- Project completed within 3 weeks.
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0888-2s6q6oen65djd6xn3ca51m.jpg)
Upshaw Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_0579.jpg)
Carr Pediatric Dentistry
Carr Pediatric Dentistry was a Dental Buildout of 2,340 sq. ft. Specific Modifications and Requirements:
- Buildout of an existing masonry building with no floor, mechanical or electrical
- Custom Tiled Reception Counter
- Custom Cabinetry and Flooring
- Art Niches throughout the Suite
- Radius walls and arched openings
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0579-2s6rcrm0cexcu78swer4zu.jpg)
Carr Pediatric Dentistry
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/DSC_0214.jpg)
Kennedy Dental
Kennedy Dental was a Dental Buildout of 2,800 sq. ft. Specific Modifications and Requirements:
- Dental suite including all new walls, floors, finishes
- Custom Cabinetry by Turn Key Builders
- Fire Sprinkler and Fire Alarm
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/DSC_0214-2s6rdmwbv9n8ua3vt3semi.jpg)
Kennedy Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/winchester2.jpg)
Winchester Medical Center
Winchester Medical Center is a four story facility with a four story atrium. The building is integrated with the hospital by a glass walled mall and connector. The building is steel framed, brick veneer and reinforced fiberglass veneer. Special features include a four story lobby, connector to the hospital and a cancer treatment center. Visit Website Download PDF
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/winchester2-2s6re2cpd97eo8x46nj216.jpg)
Winchester Medical Center
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/watson.jpg)
Watson Clinic
The Watson Clinic is one of the largest privately owned clinics in Florida. These photos show the 50,000 square foot addition that includes a new entrance and lobby. A cancer treatment center with linear accelerator was also constructed. Past projects at the Watson Clinic included a new central energy plant, MRI, new lab, and a renovation of 80,000 square foot cardiology clinic, and renovation of the south wing general care areas. Visit Website Download PDF
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/watson-2s6rethr4gc2yq5fdrgop6.jpg)
Watson Clinic
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/shands2.jpg)
Shands Cancer Center
Shands Hospital expansion is a high quality project consolidating family practice, pediatrics and specialty clinics. The Multi-Specialty facility is a two-story steel composite frame, brick/EIFS exterior accented with cast stone and granite on concrete masonry units. The facility includes Diagnostic radiology, outpatient pharmacy, pediatric specialty center, skin cancer clinic, prosthetics and orthotics, OB/GYN and family practice clinics. Visit Website
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/shands2-2s6rengmqer1kebkw6l7nu.jpg)
Shands Cancer Center
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_0253.jpg)
Riverview Family Medical
Riverview Family Medical was a Medical Buildout of 5,000 sq. ft. Specific Modifications and Requirements:
- Existing dirt floors, exposed trusses & bare masonry walls
- Building also had no mechanicals or electrical distribution
- New project included the design elements
- Upgrade commercial wood plan floors and granite counter tops
- Custom Cabinetry by Turn Key Builders
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0253-2s6rc9in6a68n7r9fo4pvu.jpg)
Riverview Family Medical
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/greenville1.jpg)
Greenville Memorial Hospital
Greenville Memorial Hospital was designed to be architecturally compatible with the adjacent Hospital structure. The five-story physician facility and ambulatory care building includes nuclear medicine, pulmonary lab, and radiology. Specific Modifications and Requirements:
- Attached to the Hospital with an enclosed connector
- Three -story atrium
- 470 car parking deck
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/greenville1-2s6rf6oph6aurtiytpvj7u.jpg)
Greenville Memorial Hospital
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/charlotte2.jpg)
Charlotte Memorial Hospital
Charlotte Memorial Hospital in North Carolina with 10 operating rooms and a diagnostic center. Specific Modifications and Requirements:
- Six-story precast concrete building / steel structure
- SkyWalk Connector
- 1150 space parking structure accommodates the building
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/charlotte2-2s6rfbpn4vmdxrdu8d9rey.jpg)
Charlotte Memorial Hospital
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/lakeland1.jpg)
Lakeland Surgical & Diagnostic Center
Lakeland Surgical & Diagnostic Center is a joint venture project between Lakeland Regional Medical Center and Watson Clinic. Specific Modifications and Requirements:
- Construction includes a steel frame, masonry skin and a drive through canopy
- Four operating rooms
- Four GI rooms
- Separate prep and recovery areas
- Integration with the Lakeland Regional Medical Center campus
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/lakeland1-2s6reznecsgb53q597itca.jpg)
Lakeland Surgical & Diagnostic Center
Medical![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img61.jpg)
Krystal Clear Dental
Krystal Clear Dental was a Dental Buildout of 2,100 sq. ft. Specific Modifications and Requirements:
- Demolition of total space and concrete floors
- Addition of plumbing & mechanicals
- The new design also included radius walls
- Custom Cabinetry & Sterile Unit by TurnKey Builders
- Radial reception center with granite counter
- Special order radius glazing detail
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img61-2s6ra03hwos7rs2bucbtvu.jpg)
Krystal Clear Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img7.jpg)
Pedraza Dental
Pedraza Dental was a Dental Buildout of 2,300 sq. ft. Specific Modifications and Requirements:
- Dental Buildout of new space
- Dirt floors, exposed trusses, & bare masonry walls
- Design Build Dental Project completed in 10 weeks
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img7-2s6rajkmc1eejargjlzgne.jpg)
Pedraza Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/IMG_0893.jpg)
Cornerstone Dental
Cornerstone Dental was a complete Demolition of 2,600 sq. ft. Specific Modifications and Requirements:
- Demolition of concrete walls, floors, etc.
- Built out complete Dental Space
- Project Construction was economical
- Blueprint and Materials used for a chain of practices
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0893-2s6ravdtfji3ruxer1d3ii.jpg)
Cornerstone Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img62.jpg)
Bourdman Dental
Bourdman Dental was a Dental Buildout of 1,400 sq. Specific Modifications and Requirements:
- Dental Buildout of Existing Walls, and Concrete Floors
- Buildout to allow for plumbing and mechanicals
- Plumbing and mechanicals for new dental chairs and equipment
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img62-2s6raa9w2dygvpiy1iaxvu.jpg)
Bourdman Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img11.jpg)
Big Bend Dental
Big Bend Dental was a Dental Buildout of 1,500 sq. ft. Specific Modifications and Requirements:
- Started with dirt floors, exposed trusses & bare masonry walls
- New design build project included radial wall design
- Buildout also included custom headers and arches
- Office also has custom ceilings, ceramic tile floors & walls
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img11-2s6q60eog9kkjxd4ivywi2.jpg)
Big Bend Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/05/img15.jpg)
American Family Dental
American Family Dental was a renovation of an existing building. Specific Modifications and Requirements:
- Alterations to existing bath and lab to expand lounge
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/img15-2s6r7rfhoulbkmumk7mvii.jpg)
American Family Dental
Dental![](https://turnkeybuildersfl.com/wp-content/uploads/2012/03/IMG_0680.jpg)
Anderson Dental
Anderson Dental is a 2,300 sq. ft demolition and renovation. The building was an existing shopping center suite. Specific Modifications and Requirements:
- Demolition and Removal of Main Switchgear
- Remove firewalls and re-build to meet code
- Total renovation for new dental-treatment chairs
![](https://turnkeybuildersfl.com/wp-content/uploads/bfi_thumb/IMG_0680-2s6q5z5g1c8orfweo84cga.jpg)